Technical Author (Client Side)
This job is in your area. Enjoy a short commute and work close to home.
Job Description
Technical Author
Reference: 2636, 2637, 2638, 2639 & 2640
Location: Sellafield Site, Cumbria
Arrangement: Permanent or Contract
Work arrangement: Hybrid, 3 days in the office and 2 days working from home.
BPSS clearance will be required at basic level. Prior clearance will not be transferable.
Project Description
The Box Encapsulation Plant (BEP) is being constructed on the SL site in Cumbria. The project is an integral part of the Magnox Swarf Storage Silo (MSSS) Program, addressing the cleanβup of one of the most hazardous legacy facilities on the SL site. When complete, the BEP is expected to treat nuclear waste recovered from MSSS, immobilise it, and prepare it for longβterm storage. In addition, the BEP may also process waste recovered during the decommissioning of other significant SL facilities, including the First General Magnox Storage Pond and the Pile Fuel Storage Pond.